Home / Guides / What Snagging Costs

What snagging costs in Dubai: fees explained

What an inspection costs, and what it protects

What affects the price of snagging in Dubai, typical fee ranges by property size, what each level includes, and how to compare quotes properly.

6 min readLast updated 1 August 2026Kensington Inspections
British-founded practiceReport delivered immediately on site20 years UK construction experienceWorking in all 7 Emirates★★★★★ 5.0 on Google
On this page

What affects the price

Two things set a snagging fee: the internal area of the property, since that determines how many checkpoints an inspector has to work through, and the service level, meaning whether you want a single inspection or a package that also includes a re-inspection once the developer has made corrections.

Villas generally cost more to inspect than apartments of the same internal area, since there is more external fabric, more rooflines and more drainage to check.

Typical snagging fee ranges in Dubai

Our own fixed fees start from 1,400 for a compact apartment, rising with internal area. Rather than repeat figures here that go out of date, we publish the current fee for every size band and service level on our pricing page.

The cost of an inspection is small against the cost of the defect it catches. The question is never whether you can afford one.

See every current price, published in full →

What's included at each level

Every level should include the site visit, the full checkpoint survey and the written report. Ours also includes thermal imaging, HVAC testing and a borescope on every inspection. The higher level, Complete, adds one return visit to re-inspect once the developer says the list is closed. Ask any company for a written breakdown of what their fee covers before you compare it against ours or anyone else's.

Worth checking

Ask whether the quoted fee includes a re-inspection. It is the single biggest difference between headline prices that otherwise look similar.

Why the cheapest quote is rarely the best value

A quote a fraction of the market rate is usually covering a shorter visit against a shorter checklist, often with nobody senior reviewing the resulting report. That matters because a defect the inspection misses does not stop existing; it simply surfaces later, once your leverage with the developer has weakened. The saving on the fee is rarely worth what it risks.

Snagging cost FAQs

Yes, almost always. Internal area is the main driver, since it sets how many checkpoints an inspector has to work through. Service level is the other main variable.

The site visit, the full checkpoint survey, and the written report with every defect photographed, measured and graded. With us that includes thermal imaging, HVAC testing and a borescope inspection of hidden spaces. Whether a return visit to re-inspect the repairs is included depends on the package: with us it is part of Complete.

With us it depends on the package. Essential is the full inspection and report; Complete adds one return visit to re-inspect the repairs and costs 50% more than Essential. If you start with Essential, you can add the return visit later at the same 50%.

Mostly checkpoint count and qualification. A quote a fraction of the market rate is usually covering a much shorter visit against a shorter checklist, with nobody senior reviewing the report.

K

Written by the Kensington Inspections team

Reviewed for technical accuracy by our technical director. Kensington Inspections carries out independent property inspections in Dubai, measured the way a UK housebuilder is measured.

See what a real report looks like

A full sample, with every entry graded and cited exactly as your own report would be.

A hand holding a phone close to the floor beside a skirting board
Published in fullEvery price we charge is on the pricing page

Before the keys change hands

Tell us the property and the date. A fixed fee comes back the same working day.

Over 7,000 sq ft, or not sure which service? Request a fixed fee.

BookWhatsApp