Window frame out of plumb; seal compromised at head
- Measured
- 8mm out of plumb over 2m
- Acceptable deviation
- 3mm per metre
Required actionRe-set frame, replace head seal, re-test.
Every defect found before you sign for the keys
You get one window to hand the developer a list they cannot argue with. We work through every checkpoint, measure every failure, and, on Complete, come back to check the repairs.
What a snagging inspection covers
Every checkpoint is signed off individually on our own platform, so none of them can be skipped or written up later from memory.
01
Structure, walls & ceilings
Cracking, plumb and level, ceiling falls, hollow plaster, riser boxing.Cracking, plumb and level, roof space, external walls, plot structures.
02
Floors, tiling & thresholds
Lippage, hollow tiles, grout lines, skirtings, wet-area thresholds.All floors and stairs, terrace and driveway falls, external paving.
03
Joinery, doors & ironmongery
Alignment, closing gaps, seals, handles, hinges, wardrobe internals.Every door and frame, all wardrobe runs, staircase joinery, gates.
04
Windows, glazing & balconies
Plumb, seals, drainage channels, balcony falls, balustrade fixings.All glazing and sliding runs, terrace falls, balustrades, rooflights.
05
Kitchen & fitted units
Carcass level, door alignment, sealant lines, appliance fit and isolation.Main and second kitchen, utility, pantry, appliance fit and isolation.
06
Electrical, lighting & distribution
Every socket and switch tested, DB labelling, lighting circuits.Every socket and switch, all boards, external lighting.
07
Plumbing, sanitaryware & drainage
Flow and pressure, trap seals, silicone lines, shower falls, leak checks.Every outlet, tanks and pumps, drainage falls, irrigation, pool plant.
08
HVAC & air quality
Airflow at each grille, temperature differential, condensate runs, filter access.Every FCU and grille, zoning, differentials, condensate runs and ducts.
09
Waterproofing, thermal & moisture
Thermal imaging of wet walls, ceilings below bathrooms, external elevations.Thermal imaging of roof, wet areas, elevations and the pool surround.
10
Fire safety & life systems
Detectors, sprinkler heads, emergency lighting, escape route clearance, extinguisher provision. A visual check against Civil Defence requirements, not a test or commissioning inspection.Detectors on every floor, sprinkler heads, emergency lighting, escape routes, gate release. A visual check against Civil Defence requirements, not a test or commissioning inspection.
11
Common areas & building plant
Lobby, corridor, lift and parking bay condition, recorded for your managing agent. Plant rooms where the building manager grants access.Community frontage, boundary walls and shared parking, recorded for your developer. Shared plant where access is granted.

See the fee for your property
Enter your size and the fee is shown before you book. Nothing to pay today.
How we measure
Anyone can call a wall crooked. We record how crooked, against the deviation normally accepted here. That is the difference between a list a developer disputes and a list a developer works through.
Each entry is graded critical, major, moderate or minor, so you know what must be closed before you sign and what can follow.
How it works
Community, unit type, developer. A fixed fee comes back the same working day.
Four to six hours for an apartment, a full day for most villas. You need not attend.
Before we leave the property, defect by defect, with the reading for each one.

What's in your snagging report
Every entry is located, photographed, measured, graded and cited against the standard it fails.
Window frame out of plumb; seal compromised at head
Required actionRe-set frame, replace head seal, re-test.
Falls run away from the gully; standing water after test
Required actionLift tray, re-screed to fall, re-waterproof and re-test.
Want a report like this on your property?
Fixed fee shown up front. Nothing to pay today. Your report on site before we leave.
Re-inspection of the developer's repairs
Handing you a defect list and walking away is the cheap version of this work. Your report is written in the language and the citations the developer answers to, we show you who to send it to and how to word it, and on Complete we go back to check what they claim to have fixed.
Written in the developer's own format, with our measurements and clause references attached, so you can send it exactly as it stands.
Once the developer says the repairs are done, we return, check the work rather than take their word for it, and reopen anything that has not been done.
Before your warranty expires we come back for what has emerged since handover, while the developer is still liable. More →
Where we work
After a few hundred units in the same development you stop looking for defects at random. We know which contractor rushes the wet areas and which tower has the balcony drainage problem.
All communities →★★★★★
“Very thorough and professional. I'll be using them from now on. Thanks for the great service!”
Google review
★★★★★
“Great communication throughout. The report was excellent. Thanks again”
Google review
★★★★★
“Great service”
Google review
Still deciding?
Booking reserves your slot and nothing is paid today. Prefer to talk first? Message us on WhatsApp.
As soon as the developer gives you a handover date. We inspect before you sign the handover documents, which is the point at which the list carries most weight. In peak handover weeks the slots go quickly, so a week or two of notice is sensible. If you have already taken the keys, book anyway. The defect liability period runs for twelve months from handover.
Four to six hours for an apartment, and a full day for most villas. We do not shorten it. A full checklist takes the time it takes, and the ones people skip are the ones in the risers, the roof space and behind the appliances.
No, and most owners are not. We arrange access with the developer, inspect, and send the report. If you would like to walk the property with us at the end we will take you through what we found, and we can do that on a live video call if you are overseas.
Before we leave the property. It is generated from the record made on site, photographed, measured and time-stamped as we go, not written up later from memory.
Eleven systems: structure and finishes, floors and tiling, joinery, windows and balconies, kitchen and fitted units, electrical, plumbing and drainage, HVAC, waterproofing and thermal, fire safety, and the common areas serving your unit. Every checkpoint is signed off individually.
Yes. We publish a full sample report, unredacted apart from the address. Read it before you spend a dirham. It is the clearest way to judge the difference between one inspection and another.
Advertised fees start at a few hundred dirhams. Ours start at 1,400 for a property up to 600 sqft, priced on built-up area above that. The calculator returns the exact fee for your property, fixed before we attend, and every price is on the pricing page.
Yes. If you would like to snag at the handover meeting itself, we can attend with you and inspect then. Tell us when you book.
Yes. We check the developer-supplied appliances are properly connected to power and working, and that their isolators and shut-off switches operate.
You can, and you should note anything you see. But a visual walk-round cannot measure how flat a floor is, find moisture behind a painted wall, or see inside a ceiling void or an air-conditioning duct. A full inspection works through every checkpoint with instruments, which is what produces a list a developer has to act on.
Ideally yes. Water, power and cooling need to be live for a meaningful inspection, because sockets, water pressure, drainage and air conditioning all have to be tested in use. If something is not connected, the report says which checks could not be completed.
Yes. Penthouses and duplexes are inspected in the same way, with extra time for terraces and stairs. On villas with pools we inspect the visible pool surround, finishes and fittings. Pool plant is recorded by its visible condition only, not tested or certified, which is a specialist job.
Because we inspect to the standard a UK housebuilder is held to: NHBC, BS 5606 and BS 5385. Those standards carry real deviations that have to be met, and checking to them takes time, training and the right instruments: thermal imaging, a borescope, moisture metering and laser levels, on every inspection. We do not just look. We measure and document every defect. A low fee is usually only possible if that work is left out, or unbundled into add-ons and repeat visits, with what is actually included only clear after a call or a WhatsApp. Our Essential fee includes the instruments, and the return visit on Complete is a fixed 50% of Essential, published before you book. Add the extras to a 999 quote and the difference narrows considerably.
It is your property, and inspections are routine in Dubai, and most developers expect them. We attend with your authority letter, or under power of attorney if you are overseas. If access is refused, we record that in writing so it is on record, and we keep half the fee for the lost visit. Re-attending is then a new booking.
That depends on your sale and purchase agreement, and we will read yours so you know which clause to quote. In practice most developers work through handover snags in the weeks between inspection and move-in, and the defect liability period gives you twelve months from handover for anything that emerges later. We point you at the dates in your contract rather than a general expectation, so what you ask for is what you are owed.
Before the keys change hands
Send us the handover date and we will come back the same working day with a fixed fee and the earliest inspection slot.
Over 7,000 sq ft, or not sure which service? Request a fixed fee.