Pre-purchase property inspection · Dubai

Know what you are buying before the money moves

On a resale there is no developer to go back to. The day the transfer completes, every defect in the property becomes yours to pay for. We survey it first, and put a number on what it will cost.

Fixed fee from 1,400before the MOU, or between MOU and transferEvery price, published in full →
British-founded practiceReport delivered immediately on site20 years UK construction experienceWorking in all 7 Emirates★★★★★ 5.0 on Google

Why inspect before you buy

Why inspect before you sign: the cheapest survey you will ever buy

A pre-purchase inspection costs a fraction of one item on this list. If the property is a new build straight from the developer, you want a snagging inspection instead. These are the repairs we most often find on a Dubai resale, and what owners have paid to put them right.

Chiller or split-system replacement
6,000 – 18,000
End-of-life compressors, no service history, no warranty transferred.
Re-waterproofing a wet area
9,000 – 25,000
Tiling lifted, screed removed, membrane relaid, everything reinstated.
Terrace or roof waterproofing
15,000 – 60,000
Usually found after the first heavy rain, by which time the ceiling below has gone.
Water tank, pump and pressure set
4,000 – 12,000
Common on villas that have stood empty, and rarely visible on a viewing.
Undoing unpermitted alterations
10,000 – 80,000
Removed walls, extended kitchens, enclosed balconies. The liability transfers with the title.
Electrical remedials and re-certification
3,000 – 15,000
Unlabelled boards, faulty circuits, additions made without certification.

Indicative ranges from work we have seen quoted in Dubai. Our report carries an estimate against every major item, so you know the number before you negotiate.

What a pre-purchase inspection covers

What a pre-purchase inspection covers: eleven systems, one report

The same survey we run on a new build, with the age of the property and its service history added to the record.

01

Structure, walls & ceilings

Cracking and movement, plumb and level, ceiling falls, past patch repairs.

02

Floors, tiling & thresholds

Lippage, hollow and drummy tiles, grout condition, wet-area thresholds.

03

Joinery, doors & ironmongery

Alignment, closing gaps, seals, wear to handles, hinges and wardrobe runs.

04

Windows, glazing & balconies

Seal failure, blown units, drainage channels, balcony falls, balustrade fixings.

05

Kitchen & fitted units

Carcass condition, water damage under sinks, appliance age, isolation and extract.

06

Electrical, lighting & distribution

Every socket and switch tested, board labelling, uncertified additions.

07

Plumbing, sanitaryware & drainage

Flow and pressure, trap seals, silicone lines, shower falls, evidence of past leaks.

08

HVAC & air quality

Age and service history, airflow at each grille, temperature differential, condensate runs.

09

Waterproofing, thermal & moisture

Thermal imaging of wet walls, ceilings below bathrooms, and external elevations.

10

Fire safety & life systems

Detectors, sprinkler heads, emergency lighting, escape route clearance, extinguisher provision and service dates. A visual check against Civil Defence requirements, not a test or commissioning inspection.

11

Common areas & building plant

Lobby, corridor, lift and parking bay condition, recorded with the building's maintenance history. Plant rooms where the building manager grants access.

Inspect before you sign the MOU

Pick a date and see your fixed fee in about a minute. Nothing to pay today.

Secondary versus new build

An apartment nobody has lived in still is not a new build

Off-plan units traded before completion and homes lived in for six years fail in entirely different ways. We inspect for the one in front of us.

Off-plan secondary

Never occupied, never snagged

  • ·Handover snags never raised, and now beyond the seller's interest
  • ·Whatever remains of the developer's warranty, and we tell you how long you have
  • ·Systems that have stood unused for two years: tanks, traps, HVAC, seals
  • ·Specification quietly changed from the brochure you were shown

Lived-in secondary

Wear, repairs and alterations

  • ·Plant at or near end of life, with or without a service record
  • ·Cosmetic repairs done over a fault rather than to it
  • ·Alterations made without permission, which transfer to you with the title
  • ·Moisture history behind a fresh coat of paint, which thermal imaging finds
Two inspectors looking at a handheld thermal camera in an empty apartment
Thermal surveyWeak cooling and failing seals both show up on a thermal camera.

How we measure

How we measure defects in a resale property

A seller will tell you the floor is fine. We record how far out it is, against the deviation normally accepted here. That is what turns a price reduction into a conversation about numbers rather than taste.

Each entry is graded critical, major, moderate or minor, and major items carry an indicative cost to remedy.

Floor and wall level3–5mm over 3m
Wall plumb3mm per metre
Tiling and hollow spotsUp to 5%, none at doorways
Wet areas and drainage fallsFalls to drain, no pooling
Windows, glazing and sealsSPA and manufacturer's spec
Smoke detectors, sprinklers and fire-stoppingUAE Civil Defence
Report reviewed before issueBy a founder

How it works

When to inspect: before the MOU, or between MOU and transfer

01
Send us the property

Community, size, age, and where you are in the transaction. A fixed fee the same working day.

02
We arrange access and inspect

Through your agent or the seller. Four to six hours for an apartment, a day for most villas.

03
You receive the report

Delivered on site, graded, with a cost estimate against every major item.

04
You negotiate on evidence

Reduce the price, ask for the work, or walk away. We talk the report through with you first.

An empty apartment with floor-to-ceiling sliding glass doors, the Dubai skyline beyond and low sun across a polished tiled floor
Before you commitAnyone can enjoy the view. Few check what might be wrong with it.

Know what you are buying, before you commit

Fixed fee shown up front. Nothing to pay today. Your report on site before we leave.

What you get

A pre-purchase report you can put in front of the seller

Every defect located, photographed, measured and graded, with the standard it fails cited. Major items carry an indicative cost to remedy, so the negotiation starts from a figure rather than a feeling.

  • ✓Every defect numbered and located to the room
  • ✓Photograph and measurement, with the acceptable deviation
  • ✓Severity grade: critical, major, moderate, minor
  • ✓Indicative cost to remedy on every major item
  • ✓A one-page summary of what we would fix before moving in
  • ✓A call with the inspector who wrote it
Read a real report first →
P-017majorLiving room · External wall below window

Elevated moisture behind recently painted plaster

Measured
19% WME across 2.1m²
Acceptable deviation
Below 16% WME before decoration

Required actionTrace ingress at the window seal, strip and dry the wall, re-plaster. Estimate 12,000 – 18,000.

Photo P-017P-017
P-034majorRoof plant · Split unit 2

Condenser at end of service life; no maintenance record held

Measured
6.4°C differential at the grille
Acceptable deviation
Minimum 8°C across the coil

Required actionAllow for replacement within twelve months. Estimate 8,000 – 12,000.

Photo P-034P-034

★★★★★

“Very thorough and professional. I'll be using them from now on. Thanks for the great service!”

Google review

★★★★★

“Great communication throughout. The report was excellent. Thanks again”

Google review

★★★★★

“Great service”

Google review

Still deciding?

Booking reserves your slot and nothing is paid today. Prefer to talk first? Message us on WhatsApp.

Pre-purchase inspection FAQs

The survey is the same; the purpose is not. Snagging produces a list for the developer to fix under warranty. A pre-purchase inspection produces a list for you to make a decision on: whether to buy, at what price, and what to budget for once the property is yours. Major items therefore carry a cost estimate rather than a repair instruction.

No. A valuation tells the bank what the property is worth. It does not lift a tile, test a socket or open an air-conditioning unit. Valuers are not looking for defects, and their report will not help you negotiate.

Before you sign the MOU if you can. That is when you have the most room to move on price or to ask for work to be done. If the MOU is already signed there is still time between contract and transfer, and the report still tells you what you are taking on.

Book anyway. Most Dubai MOUs leave a window between signature and transfer, and what we find can often be settled with the seller in that period. Even where the price is fixed, you go into ownership with a costed list rather than a series of surprises.

The deposit does not change what the property is. It changes your negotiating position, which is why we say book before the MOU. We will still inspect, and we will be straight with you about what is realistic to recover.

That depends on the terms you signed, and the contract is a question for your lawyer rather than for us. What we can do is give you a report clear enough for a conveyancer to act on. Some buyers renegotiate, some ask for the work, and some walk.

Yes, with the tenant's agreement and reasonable notice, arranged through the agent. An occupied, furnished property limits what we can reach (behind fitted furniture, inside cupboards, under stored belongings) and we state plainly in the report what we could not access.

We put an indicative range against every major item, based on work we have seen quoted in Dubai. It is enough to negotiate with and enough to budget from. It is not a contractor's quotation, and the report says so.

Before we leave the property, which matters when you are working to an MOU deadline. If your timetable is tighter than that, tell us and we will say honestly whether we can meet it.

Yes, and it is one of the most useful times to instruct us. Nobody has ever lived in the property, the original handover snags were probably never raised, and whatever remains of the developer's warranty is about to become your problem rather than the seller's.

Before the keys change hands

Tell us the property and where you are in the transaction. A fixed fee comes back the same working day, with the earliest slot we can hold.

Over 7,000 sq ft, or not sure which service? Request a fixed fee.

BookWhatsApp