Post-renovation snagging · Dubai

Sign the work off when it is right, not when the invoice arrives

We measure a contractor's work against the specification you paid for. Every item photographed, located and cited, in time to be corrected while the final payment is still yours to hold.

Fixed fee from 1,400stage inspection, completion inspection, or bothEvery price, published in full →
British-founded practiceReport delivered immediately on site20 years UK construction experienceWorking in all 7 Emirates★★★★★ 5.0 on Google

Why the timing matters

Post-renovation snagging: the final payment is your only leverage

Once the invoice is settled, every remaining defect is a favour rather than an obligation. These are the items we most often find on completed work in Dubai, and what they cost to put right after the contractor has left.

Re-waterproofing a new wet area9,000 – 25,000Tanking skipped or punctured during second fix. Found when the ceiling below stains.
Lifting and relaying a tiled floor12,000 – 40,000Hollow beds and lippage cannot be corrected in place. The floor comes up.
Refitting warped or misaligned joinery6,000 – 30,000Doors, wardrobe runs and kitchen carcasses hung out of plumb and scribed to suit.
Re-certifying altered electrical work3,000 – 15,000New circuits added without test results, and a board schedule nobody updated.
Correcting HVAC after the ceilings close5,000 – 20,000Grilles relocated, flexible duct crushed, condensate running the wrong way.
Redecorating after remedial works4,000 – 18,000Every correction made late is paid for twice: once for the fix, once for the finish.

Indicative ranges from work we have seen quoted in Dubai. Corrected before completion, most of these items cost you nothing at all.

What we check

Every checkpoint measured against your renovation specification

The same survey we run at handover, with the schedule of works, the drawings and the agreed finishes added to the record.

01

Specification & drawings

Every material, finish and fitting against the schedule you signed and paid for.

02

Structure & alterations

New openings, lintels, blockwork, and the making good around anything removed.

03

Floors, tiling & thresholds

Lippage, hollow beds, grout and silicone lines, junctions between old and new floors.

04

Joinery & fitted units

Every run: alignment, closing gaps, soft-close, scribes, and the faces nobody looks at.

05

Paint, plaster & decoration

Flatness under raking light, coverage, cutting-in, edges to trim, glass and ironmongery.

06

Kitchens, bathrooms & sanitaryware

Installation, sealing, isolation, extract, and every appliance tested to specification.

07

Electrical, lighting & certification

Every new circuit tested, board relabelled, certificates issued.

08

Plumbing, drainage & pressure

Flow and pressure at every outlet, falls, trap seals, isolation valves, concealed runs.

09

HVAC, extract & thermal survey

Relocated grilles, airflow, condensate falls, extract rates, thermal imaging of new wet areas.

Two points to inspect

Mid-works inspection: once the ceiling closes, the evidence is gone

Most defects that cost real money are buried before completion. We inspect at the stage that catches them, and again at the end. For work handed over by a developer rather than a contractor, see snagging inspection; for a property you are buying, pre-purchase inspection.

Stage inspection

Before it is boarded and closed

  • ·First and second fix photographed and recorded before anything is covered
  • ·Waterproofing, falls and drainage checked while they can still be corrected
  • ·Concealed pipe and cable runs mapped, so later works do not find them the hard way
  • ·Substituted materials caught at the point of delivery rather than at the end

Completion inspection

Before the final payment clears

  • ·Every finish measured against the schedule of works and the agreed specification
  • ·A numbered list your contractor can work through item by item
  • ·Defects graded, so the argument is about facts rather than taste
  • ·On Complete, a re-inspection once the remedials are done, confirmed to you in writing
A bright, empty apartment with open balcony doors looking out over a hazy city skyline
Before you payIt looks finished. We check it before the final payment to the renovator.

Check the work before the final payment

Enter your size and the fee is shown before you book. Nothing to pay today.

How we measure

Renovation defects are measurements, not opinions

A contractor will tell you the floor is fine. We record how far out it is, against the deviation normally accepted here. That is what turns a disputed snag into a measurement nobody argues with.

Each entry is graded critical, major, moderate or minor, and written so the trade responsible can work from it directly.

Floor and wall level3–5mm over 3m
Wall plumb3mm per metre
Tiling and hollow spotsUp to 5%, none at doorways
Wet areas and drainage fallsFalls to drain, no pooling
Windows, glazing and sealsSPA and manufacturer's spec
Smoke detectors, sprinklers and fire-stoppingUAE Civil Defence
Report reviewed before issueBy a founder

How it works

When to inspect: mid-works, at completion, or both

01
Send us the scope

The specification, the drawings if you hold them, and the date the contractor expects to finish.

02
We inspect against it

On site with the schedule of works. Four to six hours for a single room, a day for a full renovation.

03
You receive the report

Delivered on site, graded, numbered, and written for the trade that has to fix it.

04
The contractor closes it out

You hold the final payment against the list. On Complete, we re-inspect and confirm in writing what has been put right.

A gloved hand holding a steel rule against a door frame in an empty apartment
On siteEvery gap, hinge and edge, measured against your specification.

Hold the final payment against a measured list

Fixed fee shown up front. Nothing to pay today. Your report on site before we leave.

What you get

A snagging report your contractor can work from

Every defect located, photographed, measured and graded, with the standard or the specification clause it fails cited. Written so each item can be assigned, corrected and signed off without a further conversation.

  • ✓Every defect numbered and located to the room
  • ✓Photograph and measurement, with the acceptable deviation
  • ✓Severity grade: critical, major, moderate, minor
  • ✓The specification clause or standard each item fails
  • ✓A one-page summary of what to hold payment against
  • ✓On Complete, a re-inspection once the remedials are complete
Read a real report first →
R-024majorFamily bathroom · Shower enclosure

Waterproof membrane not returned up the wall behind the tray

Measured
Membrane terminates 40mm above floor level
Acceptable deviation
Minimum 150mm upstand to all wet walls

Required actionStrip tiling to the enclosure, relay the membrane to full upstand, reinstate. Contractor to correct before completion.

Photo R-024R-024
R-051moderateKitchen · Island run, units 4–7

Carcasses set out of level along the run

Measured
7mm fall across 2.4m
Acceptable deviation
±3mm over 2m

Required actionRe-level and re-scribe the run, adjust doors and drawer fronts to consistent gaps.

Photo R-051R-051

★★★★★

“Very thorough and professional. I'll be using them from now on. Thanks for the great service!”

Google review

★★★★★

“Great communication throughout. The report was excellent. Thanks again”

Google review

★★★★★

“Great service”

Google review

Still deciding?

Booking reserves your slot and nothing is paid today. Prefer to talk first? Message us on WhatsApp.

Post-renovation snagging FAQs

Both, if the programme allows it. A stage inspection before ceilings, walls and floors are closed is the only chance to see waterproofing, falls and concealed services. The completion inspection covers everything visible and gives you the list to hold the final payment against. If you can only instruct one, make it the completion inspection.

For you. We are not appointed by the contractor, we take no fee from them, and we have no interest in the remedial work. Our only output is the report.

Most disputes end when the measurement is produced. Each entry carries the reading, the acceptable deviation and the specification clause where one applies, so the conversation is about a number rather than an opinion. Where a contractor still disagrees we will speak to them directly.

Yes. We return once the contractor says the list is closed, check each item, and confirm in writing what has been put right and what has not. The return visit is included on our Complete package, and can be added to Essential later.

Yes. Without a specification we inspect against the Dubai Building Code and UAE Civil Defence requirements where they apply. For finishes, we measure the way a UK housebuilder is measured, by people who spent twenty years working to NHBC standards, BS 5606 and BS 5385, and record each reading against the deviation normally accepted in Dubai. Send us whatever you do hold: quotations, drawings, material schedules, WhatsApp messages agreeing a finish.

Yes, and most renovations are. We work around what is there, and we state plainly in the report anything we could not reach.

The survey is the same discipline; the counterparty is not. A new build is measured against the developer's obligations under warranty. A renovation is measured against the contract you signed with your contractor, and the leverage is the money you have not yet paid.

Before we leave the site, which matters when a final payment is due. Tell us the date and we will say honestly whether we can meet it.

Before the keys change hands

Tell us the scope of works and the date the contractor expects to finish. A fixed fee comes back the same working day, with the earliest slot we can hold.

Over 7,000 sq ft, or not sure which service? Request a fixed fee.