Legal · Terms of engagement
What we agree to, and what we do not
These terms apply to every inspection we carry out. They are written to be read, not to be survived, and we would rather you read them before instructing us than afterwards.
What the inspection covers
We carry out a visual and instrumented inspection of the areas of the property to which we are given safe access on the day. Every accessible item on our checklist is inspected and recorded, and each defect we raise is measured where a measurement applies.
We do not open up construction, lift fixed floor coverings, dismantle installations, or inspect areas that cannot be reached safely without equipment beyond what we bring. Where access is denied or an area is obstructed, the report says so explicitly rather than passing over it.
What an inspection is not
An inspection is not a structural survey, a valuation, a mortgage report, or a certificate of compliance with any authority's regulations. It does not warrant the property, and it does not transfer any obligation from your developer or seller to us.
Concealed defects that were not visible or detectable on the day are outside the scope. Where we suspect something we cannot verify, we record the suspicion and recommend the specialist investigation that would settle it.
Access and the day itself
You are responsible for arranging access and for confirming that utilities are connected. Water, power and cooling need to be live for a meaningful inspection; without them a significant part of the checklist cannot be completed.
If we attend and are turned away, cannot gain access, or the property is not in a state that allows the inspection to proceed, we keep half the fee for the lost visit. Re-attending is a new booking, made and paid for in the usual way. We record the refusal in writing at the time, so the date and the reason are on record.
Power of attorney
Where you ask us to act for you, for example to collect keys, attend the handover or sign handover documents, we do so under a power of attorney that you have put in place. Obtaining it is entirely your responsibility. We do not arrange, draft, notarise or legalise a power of attorney, and we do not give legal advice on one.
You bear every cost of the power of attorney, including drafting, notarisation, legalisation, translation and any fee charged by the developer or an authority in connection with it. We are not responsible for delays, refusals or extra costs that arise because a power of attorney is missing, invalid or does not cover what the handover requires. Without one, we can still attend, inspect and report, but we cannot sign on your behalf.
Fees and payment
Fees are fixed in writing before we attend and are based on the internal area and unit type you give us. If the property is materially larger than described, we will tell you before starting and agree the revised fee with you first.
Payment is due in full 24 hours before the inspection and confirms the booking; where it is not received we do not attend. Where a package includes a de-snag re-inspection, it is covered by the original fee and is not invoiced separately.
Re-inspection and closure
Where your package includes a de-snag re-inspection, we return once the developer or contractor reports the repairs complete and verify each item individually. An item is only closed when the repair brings it within the acceptable deviation recorded in the original report, or resolves it where no figure applies.
The de-snag re-inspection is one return visit. It may be booked at any time before your twelve-month defects liability period ends, and it covers only the defects listed in our original report. Defects that were not in that report are outside its scope. If any item is still open after the visit, further re-inspections can be booked at a fixed fee, quoted before we attend.
Liability and insurance
We carry professional indemnity cover and will provide the certificate on request. Our liability is limited to the fee paid for the inspection except where the law does not permit that limit.
Nothing in these terms restricts your rights against your developer, contractor or seller. Our report exists to help you exercise them.
Governing law
These terms are governed by the laws of the Emirate of Dubai and the applicable federal laws of the United Arab Emirates, and the courts of Dubai have jurisdiction.
Before the keys change hands
Tell us the property and the date. A fixed fee comes back the same working day.
Over 7,000 sq ft, or not sure which service? Request a fixed fee.